AmanaOnline

News

Lagos-Calabar Coastal Highway – whopping 11 Billion per Kilometer and ONLY 32 Kilometers Completed in Two Years

Lagos-Calabar Coastal Highway – whopping 11 Billion per Kilometer and ONLY 32 Kilometers Completed in Two Years
May 30
00:07 2025

Lagos-Calabar Coastal Highway

The Lagos-Calabar Coastal Highway is a 700 kilometer project under development (as of 2025) that is planned to run from Victoria Island, Lagos to Calabar, Cross River State. The highway will pass through Ogun State, Ondo State, Delta State, Bayelsa State, Rivers State, and Akwa Ibom State, before ending in Calabar. The project is intended to connect the western and south-eastern regions of Nigeria, and to improve cross-country connectivity and trade relations.

Expected to be completed by 2031

West end. —  Lagos

South end. —  Calabar

States it will Cross

Lagos State, Ogun, Ondo Delta State, Bayelsa State, Rivers State, Akwa Ibom State, and Cross River State

  • Construction

The construction of the Lagos-Calabar Coastal Highway began in March 2024 under the administration of Bola Tinubu with the first phase, which stretches 47.47 kilometers from Lagos. The highway is expected to be completed in eight years and will cost N4 billion per kilometer

  • Controversies

  • High costs and perceived misplaced priority

with initial estimated costs of between $11 billion and $12.5 billion, or roughly N14 trillion to N15.6 trillion Nigerian Naira (using 2024 exchange rates of ~ #1500:$1), commenters questioned the priority of such an expensive project given the prevailing economic condition of the country.

  • Contract bid/award transparency

Further, the quick passage of the funding bill in the national Assembly and contract award to a firm connected to the president raised suspicions.

The first phase of the project was awarded to Hitech Construction Company Ltd.

  • Environment impact assessments

The planned route of the highway traverses sensitive areas like wetlands and mangroves. Reports claim that required environmental assessments did not occur. Concerns include impact of heavy machinery during construction as well as post construction impacts of soil erosion and increased surface water runoff disturbing aquatic ecosystems. The actual highway may also disrupt migratory patterns for local wildlife as well as increase their likelihod of becoming roadkill.

  • Destruction of homes and businesses

Several businesses and homes were slated for demolition in order to create a path for the highway. Among the impacted businesses were portions of Landmark Leisure Beach.

While some of the demolition were on government right of way which had been on the books for years and should have been vacant, portions of the highway’s path were realigned to mitigate issues discovered as construction began.

 

—Wikipedia

Tags

AmanaOnline Newsletter

We give a quick summary of the latest Breaking news and Topical opinions from Nigeria.

Search AmanaOnline

Disclaimer

Disclaimer


The information contained in this portal is for general information purposes only. The information is provided by AmanaOnline.com.ng.

While we endeavour to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability, availability or guarantees, with respect to the claim and/or the website, or the information, the products, the services, or the related graphics contained on the website, for any purpose.

Any reliance you place on such information is therefore strictly at your own risk.
Information presented on this website is considered public information (unless otherwise noted) and may be re-distributed or copied.

Use of appropriate byline/photo/image credit is requested.

AmanaOnline © 2001

Archives

Reset password

Enter your email address and we will send you a link to change your password.

Get started with your account

to save your favourite homes and more

Sign up with email

Get started with your account

to save your favourite homes and more

By clicking the «SIGN UP» button you agree to the Terms of Use and Privacy Policy
Powered by Estatik
Enable Notifications OK No thanks